Wednesday, 11 April 2012

9 ~ 13 April 2012 (Week 12)

Title of Activity:
Project Progress.
ü  Development of the Project Casing (Part 1)

Objective:
  • Construct the casing for the project.
  • Combine all the parts together.
  • Analysis result for the each part.

Content/Procedure:


Picture of the material used to construct the casing
(measuring the height of the pillar)
Cut the aluminium using the metal saw
Picture of the finished Pillar for the casing
Drilling the Base Board to attach the T-joint (metal)
Picture of the finished drilled base board
Attach the T-joint (metal) and screw it on the base board
Picture of the finished all of the T-joint on the base board

Drilled the pillar for the screw holes
Picture of the finished Pillar join on the base board  
Construction process for the casing 
Picture of the finished Casing
Picture of the Casing (Part 1)


Result and Analysis:

As a result, this week the progress are to make sure the casing is constructed completely. And the casing part will be combining together with the Solar Panel, Thermoelectric module and Wind Turbine.


Conclusions:

            As a conclusion, the casings parts have been constructed using are common material. And all this material is used to construct the casing. And by the end of this week this part will be finished by combining all of the hybrid part and try to analysis the output result. 