Friday, 13 April 2012

9 ~ 13 April 2012 (Week 12)

Title of Activity:
Project Progress.
Development of the Project Casing (Part 2)

Objective:
Construct the casing for the project.
Combine all the parts together.
Analysis the result for the each part.

Content/Procedure:
Picture of the 8 coils for the stator part
Use Hot Glue to Attach the coils on the base board
Make sure the coils arrangement are correct
Glue the wire neatly
Combine the Wind Turbine together with casing
 Screw the casing tightly
Combine the acrylic together with the casing
Soldering the Hybrid Circuit
Arrange the Hybrid Circuit neatly
Attach the Solar Controller and Hybrid Circuit to the Acrylic
Drilling the Base Board
Attach the aluminium on Base Board  
Installed the Battery on Base Board

Result and Analysis:
Picture of the Wind Turbine Output Indicator is ON

Picture of the Wind Turbine Output (1.1 Volt)
Conclusions: