Title of Activity:
Project Progress.
Development of the Project Casing (Part 2)
Objective:
Construct the casing for the project.
Combine all the parts together.
Analysis the result for the each part.
Content/Procedure:
 |
| Picture of the 8 coils for the stator part |
 |
| Use Hot Glue to Attach the coils on the base board |
 |
| Make sure the coils arrangement are correct |
 |
| Glue the wire neatly |
 |
| Combine the Wind Turbine together with casing |
 |
| Screw the casing tightly |
 |
| Combine the acrylic together with the casing |
 |
| Soldering the Hybrid Circuit |
 |
| Arrange the Hybrid Circuit neatly |
 |
| Attach the Solar Controller and Hybrid Circuit to the Acrylic |
 |
| Drilling the Base Board |
 |
| Attach the aluminium on Base Board |
 |
| Installed the Battery on Base Board |
Result and Analysis:
 |
| Picture of the Wind Turbine Output Indicator is ON |
 |
| Picture of the Wind Turbine Output (1.1 Volt) |
Conclusions: